<- All Jordan Procurement Guides
Financial & Submission Rules Updated: 2026-11-19

Bid Bonds, Stamp Duty, and Two-Envelope Rules Under Jordan By-Law No. 8 of 2022

Practical summary of Bid Bond rates, Performance Bonds, 0.6% Jordan Stamp Duty, JoFotara compliance, and Two-Envelope disqualification rules.

Many technically strong bids in Jordan are disqualified at envelope opening because of preventable financial or packaging errors. Reviewing four core requirements under By-Law No. 8 of 2022 before sealing envelopes eliminates the majority of administrative rejections.

1. Statutory Guarantees and Tax Lock-Ups

  • Bid Bond (Article 29): Ranges between 1% and 3% of the offer or estimated value (commonly 3% in Greater Amman Municipality and municipal tenders, or a fixed lump sum in Aqaba Development Corporation notices). Must be an unconditional bank guarantee or certified check placed in a separate sealed envelope, valid for at least 90 days under Article 28 (or 180 days on ADC Aqaba notices).
  • Performance Bond: Winning bidders must furnish an unconditional Performance Bond of at least 10% of contract value prior to signing.
  • Maintenance Bond: Construction and electromechanical contracts typically require a 5% Maintenance Bond upon substantial completion.
  • Jordan Stamp Duty and JoFotara: Factor 0.6% Import Stamp Duty (رسوم طوابع الواردات) into final pricing, and confirm active company registration on Jordan's National Electronic Invoicing System (JoFotara), which is mandatory across GAM and central tenders.

2. Two-Envelope Separation Trap (Article 37)

In engineering consultancy, IT systems, and complex works tenders requiring separate Technical and Financial envelopes (مغلفين فني ومالي), the evaluation committee opens only Technical Proposals in Stage 1. If a Technical Proposal contains any JOD amount, unit rate, discount, or fee table, the committee is legally obligated to disqualify the bid immediately and return the Financial Envelope unopened.

Before printing or uploading a Technical Proposal, run a full text check across every appendix, header, footer, and pasted BOQ table to ensure zero currency numbers remain inside the technical file.

Put this guide into action on active Jordanian tenders Run instant GTD checks, By-Law No. 8 specification audits, and Two-Envelope PDF scans.
Start 7-Day Free Trial

More Reference Guides